| - | To be designed (chairperson) |
Former chairperson:
| - | Frank G. LEMOINE (service 2003-2005) | NASA GSFC, USA |
The Group should include a representative of the DORIS Stations Installation and Maintenance Service ( IGN SIMB) and scientists involved in various applications such as geodesy, geophysics, altimeter calibration, tide gauges, ITRF collocation...)
The mandate of the group is to:
- Define Sites Criteria (International Space Geodetic and Gravimetric Network - ISGN, DORIS Stations Installation and Maintenance Service…), taking into account the DORIS system specificity (jamming, interference…).
- Analyze the proposals with respect to these Criteria.
- Propose a list of stations according to the number of beacons available for the Experiment, as stated by the Steering Committee.
The DORIS Stations Installation and Maintenance Service together with the selected candidate will then manage the installation in the same way as for the existing permanent network.
For additional information see the Stations Selection Committee Page.





